Hi all
I have this problem and expect you can help me
1) I created a maintenance strategy whit the frecuencies 3, 6, 9, 12, 18, 24, 36, 48 and 60 months, We inclued all this frecuencies beacuse one material can have different studies with different duration
2) In CWBQM I selected all this packages (3,6,9,12,18,24,36,48,60)
3) In QST01 I created the stability study, with a scheduling period of 24 months.
When i Execute transaction IP30 the system creates:
one inspection lot for 3months frecuency
one inspection lot for 6months frecuency
one inspection lot for 9months frecuency
one inspection lot for 12months frecuency
one inspection lot for 18months frecuency
one inspection lot for 24months frecuency
one inspection lot for 36months frecuency
one inspection lot for 48months frecuency
The study duration in this case is 24 months, so I don't want aditional lots (36, 48 months)
I wonder if you could help me to identify why the system is having this behavior. I'd be glad to hear your opinion. Any ideas ?
diana