Hi Ajay,

 

You have mentioned to check the SPL in plant B for the material this has the following setting:

 

procurement type = F

SPK=70

 

when I check the SPK 70 in OMD9 for plant B:

 

Procurement type=E

Special Procurement type= E

Plant = Blank

 

then in section "As BOM component:

 

tick in the option "withdr.altern.plant  -----issuing plant = plant A

 

Are the above settings correct? because when I run CK11n I still get the same error messages.

 

thanks

 

Joe