Hello Experts,
We have PO-SO process in our client business process.
Receiving side raises the PO and once they save it system create SO on supplying side, now one supplying side they created the delivery and GI. Once the GI is done on supplying side system create the inbound delivery on receiving side and using this inbound delivery user do the GR through t-code: VL32N.
While doing the GI by mistake user deleted the item at inbound delivery and later he deleted the inbound delivery as well. further He created the new Inbound delivery with reference to PO and did GR as well but the problem is when we do GR on receiving side system triggered one Idoc through the output OPOD. which generate the Proof of delivery on supplying side but in my case because user deleted the original inbound delivery and created another new inbound delivery (with reference to PO) so system break down the connection between SO (supplying side) and inbound delivery on receiving side and now system throw the error "Delivery not GI posted, not POD-relevant, or already POD confirmed" in WE02.
Basic type DELVRY03
Message type STPPOD
I am unable to reprocess this error as well I don't know what to do now ??
Kindly suggest what to do ?
Thanks,