Quantcast
Channel: SCN: Message List
Viewing all articles
Browse latest Browse all 9052

Costing Variant for Product Cost Collector

$
0
0

Hello All Experts,

 

We have scenario where we were using "Production Order" for some time and now decided to use "Product Cost Collector". For production order we configured costing variant which worked fine till time, as now we are switching to PCC ( Product Cost Collector ), I want to assign the costing variant which was used for production order, but I am not able to view it in F4 not sure why ?

 

I can see PPP1 and PREM as an assignment in cost collector. is there any problem in my understanding that PCC needs to have a different cost collector or any configuration is missing ? This issue came up when we tried to run "Costing" ( Costing button in PCC not CK11N ) for PCC it showed a "Zero" values in "Target Cost" field. When I checked I saw two different "Costing Variants" in PCC.

 

Experts guidance will be great on this.

 

 

Regards,

Sharvari Joshi.  


Viewing all articles
Browse latest Browse all 9052

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>