Re: Planning calendar for 7 days

$
0
0

Hello Abhay,,

 

Planning calendars define flexible period lengths for material requirements planning at plant level. Using the planning calendar, you can define flexible periods for a period lot-sizing procedure in master production scheduling and in MRP. As per you requirement you want to planning calendar all 7 days then what is the purpose of the maintaining the planning calendar, just create the factory calendar with all 7 working days and run MRP every day and you got your result. This is not possible. there is no solution from SAP to creates planned orders dates into non-working days.

 

You can create production orders in non-working days but  not planned orders.

If you want run your production Monday to Monday and in this case you follow the below step for fulfilled your requirement.

 

You should create two factory calendars

 

     1. Monday  to Friday , (ex: F1)

        This factory calendar assign all the level of organization, but don’t assign to the any filed of              WorkCentre,This factory calendar assign at plant level

 

      2.  Monday to Monday (ex: F2) (All days of week)

          You assign this calendar to WorkCentre CR01/CR02, Capacity header- Factory caledar  Id:             “F2”. This factory calendar assigned to only at WorkCentre level,

 

Here no need to create the spcl  planning calendar, As per your requirement create planning calendar and assign to material master MRP view 2 (ex. 5 days working)

 

Please check and revert

 

I hope this information helpful to you ,

 

Regards

Umesh Mali