Hi Experts
I have installed SAP HANA SP07 version with patch level 4 on one of the node of a 4 node server.
4 nodes A B C D
on node A i have installed AP HANA SP07 version with patch level 4 and everyting is working fine form HANA Studio 8.2
on node B i have installed AP HANA SP07 version with patch level 4 HLM is not working with HANA Studio 8.2 and at oslevel to.
i did update to latest HLM version ie., sp7 patch12.
but still the same error.
welcome any suggestions.
Thanks
Kishore