Hi Kiran,
But in this case, those cost centers I run into trouble with are those each of which only has one line of record in CSKS table though. for example, Cost Center #1, valid to 06/30/2015. there is another line for the same cost center #1 contained in the same. What I can do if I want to load it into MDG-F or I want to create it from MDG-F.
Thanks,
LUO