Hello Experts,
Working on OEE ?(Overall Equipment Efficiency) Report. PP Work Centre wise OEE %age is the purpose.
Three key figures, Availability, Performance and Quality With main characteristic as PP Work Centre.
I am stuck up with PM Notifications against PP Work Centres. Below is the process i followed.
MKPF(Date), MSEG -AUFNR= AFRU AUFNR
AFRU-AUFPL = AFVV- AUFPL
AFVC- AUFPL = AFVC-ARBID
AFVC-ARBID = CRHD- OBJID
CRHD-OBJID = CRTX-OBJID
This way found the PP Work Centre for each order.
Now, i am finding the Link to get the Maintenance , Breakdowns from PM Notifications. Found one Link CRHD-PPSID=VIQMEL-PPSID. This link is working for few Work Centres and not for all.
Alternatively what i did is moved step by step from Notification table VIQMEL to MSEG table based on Notifications created for each functional location.
Here, i found AFVC table has some other AUFPL, this is because different Routing, and Control key , Number Ranges maintained for PM Workcentres.
My Requirement is to link the notifications from Maintenance Work Centre to PP Work Centre and vice versa. In simple, want to get maintenance and breakdown notifications against PP Work Centres.
I have been searching in the forum, but not yet found exact solution. Please answer asap.
Thanks
Mohd Ismail.