Hi,
I'm trying to do a gatp check with loc subst and cps scheduling.
In the cps scheduling for transit time, I'm maintaining route, MOT and plant as condition record fields for both duration and calendar schema.
When an SO is created in ecc, the route value for the original delivery location is used in the substituted location also during the gatp check and cps scheduling happens based on the original route value and not as per the route value of the substituted location. But my route values are different for these locations as per the dest ctry/recv ctry/ship cond/trans grp in ecc.
How do we handle this situation?
Thanks,
Ram