Hi Folks,
I have a requirement in my project wherein, we want to pull only the latest changed or created materials from SAP by giving a time range.
The details about the requirement is that, initially we want to push all the materials created in ECC to an external legacy MES system.
Since materials are not changed or created very frequently, we want to schedule a background job that runs every day or every week to fetch materials, only created or changed in that duration.
Is there a standard BAPI to do so?
Regards,
Gita