Quantcast
Channel: SCN: Message List
Viewing all articles
Browse latest Browse all 9052

No GR with ref to replenishment outbound delivery

$
0
0

Hello,

 

I have used SPED output to  trigger it from replenishment outbound delivery. As soon I do PGI, SPED is issued which creates inbound delivery (shiiping notification). It gets attached to outbound delivery in document flow.

 

1.JPG

 

dping PGI puts the goods in transit. Now as per standard process, when I do GR with ref to outbound delivery in MIGO, system does not allow it. error code 6  comes as follows.

 

2.JPG

3.JPG

 

 

However when I  do GR with ref to inbound delivery in MIGO, system gives an error that "document flow for delivery cannot be updated (M7352). I was able to remove this error in T code OMCQ and making it from E to Blank. Then I was able to post a GR with ref to inbound delivery in receiving plant and the  material document is updated in STO (PO-history tab).

 

6.JPG

 

4.JPG

5.JPG

 

I need to know why it is not possible to do GR with ref to outbound delivery in my case.  why error code 6 comes  ?  Is it because inbound delivery exists with ref to outbound delivery ? And is there any way to do GR with ref to outbound delivery ? if there is a way, that will be good in my case.

 

secondly if there is no way to do GR with ref to outbound delievry in my case, then  i think there should not be an issue  if GR can be done with ref to inbound delivery too !

 


regards

 

Pamela

 

Message was edited by: Pamela Pilch

 

Message was edited by: Pamela Pilch


Viewing all articles
Browse latest Browse all 9052

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>