Quantcast
Channel: SCN: Message List
Viewing all articles
Browse latest Browse all 9052

Re: ICO configurations not working

$
0
0

Thanks for all your replies.

 

To reconfirm once again our landscape has following servers.

 

2 ECC Dev Servers -- 1 for actual development & another for testing. (ECC DEV TEST)

in similar for Quality

2 ECC QA servers -- 1 referring to actual quality & another for UAT (ECC QA TEST)

 

But there is only one PI DEV server which connects both ECC DEV  & ECC DEV TEST

 

in similar PI QA server will connect to both ECC QA & ECC QA TEST.

 

Now I have changed the configurations in ICO which is pointing to ECC QA to ECC QA TEST.

 

I have done the below configurations for that:

 

1. Run RZ70, this included technical system in my SLD landscape and I have created a business system ECC_QATEST

 

2. Imported this ECC_QATEST in quality integration builder directly

 

3. Created SOAP communication channel where the URL is pointing to new ECC QA TEST

 

4. In ECC QA TEST created a new user PIAPPL_QATEST and that user is configured in SOAP receiver adapter

 

5. RFC Destination (SM59) of type H is created in ECC QATEST which is pointing to PI QA server

 

Then I touched ICO configurations directly in PI-Quality system.

 

In receiver tab I have changed the target system to ECC-QATEST and new SOAP comm channel created is assigned in ICO configurations.

6. Activated the ICO configurations in PI Integration directory (PI QA server)

 

While dropping the file I could see messages processed but going to old ECC QA system, its not poining to new server.

 

Thanks,

--Kishore


Viewing all articles
Browse latest Browse all 9052

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>