Hello Team,
I am creating an ETO scenario in system. I have been able to explode the PS BOM as Network/Activity level and I can also see the right cost of the same from menu CJ20N --> Network selection from tree ----> Edit --> Cost --> Cost Itemization. This shows cost of around 31,000.
Now, when I try to do any goods movement of the finished good, I am getting zero cost which is mainly the cost from material master accounting 1 view. I have not released any standard cost at material level (CK11N & CK24)
I did initial stock upload (561 Q) to check the scenario. I also checked the QBEW table. In QBEW, field LBWST (Curr. Val. Strat.) is having value: '3' (Value from Make-to-Stock Inventory). So ideally system has done the right thing but I am not sure how 3 came in this field.
I want the cost calculated in PS through PS BOM to reflect as standard cost related to project stock. If I am not clear is explanation, please ask question to me.
Any help is appreciated.
Thanks.
Jay Shah.