Hi SCN members,
We are facing a problem with CKMLCP, end user made an attempt to run cockpit on decmeber. Once he was told he could only run it for previous Period, he ran CKMLRUNDEL to erase it.
Problem is, he was pass the Revaluation of Consumption, only had to do the Post Closing. After he deleted the Costing Run and tryed to start one for the previous period (november), the plant did not appear to be used.
CKMSTART, CKMF and CKMG are already executed. Our valuation is configured to happen at Plant level. Is there a manual way I can reverse this Revaluation so that the Plant can be used?
The plant itself is not "locked" with december Costing Run because when he made the attempt to create another run for december, the plant appeared for him. Just for November it did not.
Thanks and regards
Yuri