Hi
We are facing below issue after implementing work manager
1.When trying to do reversal for old measuring point measuring document or reset reveral ,it is not allowing to do reversal or reset reversal saving..
We can see all measuring points that are created from this transfer of measuring point are shown in sm12 imptt table as locked and it is fetching all measuring point measuring document for update .Due to this system is hanging and throwing dump after some time
eg.Measuring document 12345 is created for measuring point ABC..Measuring point ABC has totally 1000 records
Measuring point No of measuring documents sample measuring document
ABC 1000 A12345 dated 20.11,2011 time 10.05.00
ABC1 2000
ABC2 3000
ABC3 4000
ABC1/ABC2/ABC3 measuring points got created from transfer of ABC measuring point
So when measuring document A12345 is either set for reversal or reset for reversal,it is not allowing to do now as in debug we can see it is fetching all subsequent measuring documents of ABC1/ABC2/ABC3 instead of ABC measuring point subsequent measuring documents that are created
We are doing coding to fix this issue.But to my surprise there is not issue when new measuring point is created with transfer from ABC and when they are reversed no issues
Can you tell us if this is a bug with work mananger or should we do any additional coding to fix this to fetch only the respective measuring point documents for subsequent updates
SM12 table has lock entries of IMPTT ABC,ABC1,ABC2,ABC3 and /syclo/point_Ex
Note-New measuring points when created from transfer, we don't have any measuring document issues
regards
Swetha