Alright so lets take scenario one which I also think is logical. "if you say plant 2 & plant 3 will receive there material in Mumbai storage location (which belongs to Plant 2 & 3 respectively) & then you proceed to next level is move material from Mumbai storage location of Plant 2 &3 to Plant storage location in the form of STO .. my answer is Yes."
- Ill define 2 storage locations in Mumbai plant which will only take in plant 2 and 3 material respectively.
- Kindly guide me from this point forward..
now ill goto mb1b and us mvt type 309 to transfer material plant to plant.
- any further steps?
Thanks
shankar